Before - 6 jan'99 / 7 jan'99 - 14 jan'99 / 15 jan'99 - 25 jan'99 / 26 jan'99 - 28 mar'99 / 29 mar'99 - 17 JLY 2000
and NOW
26 jan'99 - 28 mar'99 (3)
"BEEP HEADS" Construction history
by kotobuki hikaru
image image image image image image image image image

The carpet of white and the orange color is put in the floor, wall and the ceiling, and put together. It is shot with the stapler for the extractive industry. A fluorescent light is taught in the ceiling.
A main desk was completed as the design. A material is carried, and it begins to take it in the set with soldering a cable. To a certain extent, it is the place where a place place was settled, and computer is assembled. The video device which connects a vocal booth with the control room is installed.
Work does an interphone. The rest is sensitive tuning of all the device. Both of the hardware and the software are collected partial every so that it can correct it easily even if affair appears.
Then, maturity.
Before - 6 jan'99 / 7 jan'99 - 14 jan'99 / 15 jan'99 - 25 jan'99 / 26 jan'99 - 28 mar'99 / 29 mar'99 - 17 JLY 2000