"BEEP HEADS" Construction history
by kotobuki hikaru
image image image image image image image image image

While the engineering works of the panelboard was being done, a sound arresting door and sound arresting aperture got out of the way.
Sound arresting seat was put in the floor which basic was made in and which was raised, and the wall. It goes ahead of several times pair for that time though it reaches ceiling back and glass wool is piled up with the style form. Gypsum board is piled up above all and carefully several sheets, too, and put, and put together.
A sound arresting door and sound arresting aperture are installed with being careful that a gap doing not open, too.
Equally, a power supply and a multi-cable are buried in the wall and the floor.